Close

Drinking Water supply will be Temporarily Suspended to Goundampalayam, Vadavalli, Virakeralam areas of Coimbatore Corporation on 21.01.2023 and 22.01.2023 for Bridge Works – Press Release

Publish Date : 20/01/2023

The pipes connection works for Periyanaikkanpalayam flyover works in Goundampalayam Vadavalli Veerakeralam Combined Drinking Water Supply Scheme maintained by The Tamil Nadu Water Supply and Drainage Board will be taken up on 21.01.2023 and 22.01.2023. It is expected that the Drinking water supply will be made operational from the morning of 23.01.2023. therefore, local bodies and the general public are requested to make alternative arrangements through their local water sources.