District Collector Inspected the Pillur 3rd Water Project Tunnel Construction work at Kattanchi Hills
Publish Date : 31/03/2022
District Collector Dr.G.S. Sameeran I.A.S Inspected the Pillur 3rd Water Project Tunnel Construction work progress at Kattanchi Hills on 30.03.2022. (PDF 25.9KB)